The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Sep. 23, 2025
Filed:
Jan. 05, 2022
Kone Corporation, Helsinki, FI;
Markku Haapaniemi, Helsinki, FI;
Matti Rasanen, Helsinki, FI;
Sami Saarela, Helsinki, FI;
Anssi Venho, Helsinki, FI;
Janne Mikkonen, Helsinki, FI;
Otto Lanz, Helsinki, FI;
Tarvo Viita-Aho, Helsinki, FI;
Petri Kere, Helsinki, FI;
Kone Corporation, Helsinki, FI;
Abstract
The invention relates to a method for transporting construction material and/or equipment into and inside a building under construction, wherein the building under construction comprises plurality of vertically displaced floors, the method comprising providing a control system configured to automatically operate one or more transporting devices, including at least an elevator; providing a storage at the construction site of the building; and transporting into the storage at the construction site of the building under construction plurality of transport containers containing construction material and/or equipment; storing said transport containers in the storage; and delivering transport containers belonging to said plurality of transport containers from said storage to different destination floors, the delivering comprising obtaining an order to deliver a transport container, the order identifying the transport container to be delivered; and retrieving the transport container identified in the order from the storage; and moving said transport container at least horizontally to a container loading floor of the building under construction; and loading said transport container on the load receiving unit for being moved to its destination floor; and obtaining the destination floor information indicating the destination floor of said container; and moving the load receiving unit vertically in the elevator shaft to the destination floor of said transport container; and unloading said transport container from the load receiving unit to the destination floor of said transport container. The invention also relates to a method for constructing a building and an arrangement for transporting construction material, which implement the method for transporting construction material and/or equipment into and inside a building under construction.