The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 19, 2025

Filed:

Jul. 14, 2020
Applicant:

Johnson Controls Tyco Ip Holdings Llp, Milwaukee, WI (US);

Inventor:

William Leslie Kopko, Jacobus, PA (US);

Assignee:

TYCO FIRE & SECURITY GMBH, Neuhausen am Rheinfall, CH;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F25B 39/02 (2006.01); F25B 5/04 (2006.01); F25B 6/04 (2006.01); F25B 41/39 (2021.01); F28D 7/00 (2006.01); F28D 7/16 (2006.01); F28D 21/00 (2006.01);
U.S. Cl.
CPC ...
F25B 39/02 (2013.01); F25B 5/04 (2013.01); F25B 6/04 (2013.01); F25B 41/39 (2021.01); F28D 7/0075 (2013.01); F28D 7/163 (2013.01); F25B 2339/0242 (2013.01); F25B 2400/0403 (2013.01); F25B 2400/0409 (2013.01); F25B 2400/0411 (2013.01); F25B 2400/075 (2013.01); F25B 2400/13 (2013.01); F25B 2400/23 (2013.01); F28D 2021/007 (2013.01); F28D 2021/0071 (2013.01);
Abstract

A heating, ventilation, air conditioning, and/or refrigeration (HVAC&R) system includes a first vapor compression flow path having a first condenser configured to place a working fluid in a heat exchange relationship with a cooling fluid, a second vapor compression flow path having a first evaporator configured to place the working fluid in a heat exchange relationship with a conditioning fluid, and a shared vapor compression flow path having a second condenser configured to place the working fluid in a heat exchange relationship with the cooling fluid and a second evaporator configured to place the working fluid in a heat exchange relationship with the conditioning fluid. The first vapor compression flow path is configured to direct working fluid vapor from the second evaporator to the first condenser and the second vapor compression flow path is configured to direct working fluid liquid from the second evaporator to the first evaporator.


Find Patent Forward Citations

Loading…