The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Aug. 12, 2025
Filed:
Apr. 14, 2021
Enpro Subsea Limited, Aberdeen, GB;
Ian Donald, Inverurie, GB;
John Reid, Perthshire, GB;
Craig Mcdonald, Aberdeen, GB;
Michael Mcghie, Aberdeen, GB;
Enpro Subsea Limited, Aberdeen, GB;
Abstract
The invention provides a subsea oil and gas production installation, methods of installing the installation and methods of use. The installation comprises a subsea production system comprising a first production pipeline and a second production pipeline, a first subsea manifold in fluid communication with the first production pipeline comprising a fluid access interface and a flowline connector, a removable module fluidly connected to the fluid access interface of the first subsea manifold and configured to receive production fluid from one or more subsea wells and a second subsea manifold in fluid communication with the second production pipeline. The first subsea manifold defines a first flow path between the fluid access interface and the first production pipeline and a second bypass flow path between the fluid access interface and the flowline connector. The first and the second subsea manifolds are fluidly coupled to one another by a connecting flowline which is connected at a first end to the flowline connector of the first subsea manifold. The removable module comprises a flow control means operable to selectively route the production fluid from one or more subsea wells into the first production pipeline via the first flow path defined by the manifold, and/or into the second production pipeline via the second bypass flow path, the connecting flowline and the second subsea manifold.