The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 29, 2025

Filed:

May. 24, 2022
Applicant:

Saudi Arabian Oil Company, Dhahran, SA;

Inventors:

Osman Hamid, Houston, TX (US);

Hussain Albahrani, Al Qatif, SA;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/04 (2006.01); E21B 47/04 (2012.01); E21B 47/06 (2012.01); E21B 47/08 (2012.01); E21B 47/10 (2012.01); E21B 49/00 (2006.01); E21B 49/02 (2006.01); E21B 49/08 (2006.01); G01B 5/12 (2006.01); G01N 33/24 (2006.01); G01V 20/00 (2024.01); G01V 99/00 (2024.01); G06F 30/23 (2020.01);
U.S. Cl.
CPC ...
G01V 99/00 (2013.01); E21B 43/04 (2013.01); E21B 47/04 (2013.01); E21B 47/06 (2013.01); E21B 47/08 (2013.01); E21B 47/10 (2013.01); E21B 49/006 (2013.01); E21B 49/02 (2013.01); E21B 49/08 (2013.01); G01N 33/24 (2013.01); G01V 20/00 (2024.01); G06F 30/23 (2020.01); E21B 2200/20 (2020.05);
Abstract

The systems and methods described in this specification relate to installing a wellbore completion setup of a wellbore based on a probability within a reservoir. The systems and methods measure one or more properties of the formation and receive data representing the one or more measured properties. The systems and methods use the one or more properties as input conditions to a finite element model of the wellbore. The systems and methods solve the finite element model to determine stresses of the formation surrounding the wellbore. The systems and methods determine a size of one or more rock fragments based on whether the determined stresses from the finite element model are greater than a threshold stress of a failure criterion. The systems and methods determine the probability, select the wellbore completion setup of the wellbore based on the bridging probability, and install the selected wellbore completion setup in the wellbore.


Find Patent Forward Citations

Loading…