The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 29, 2025

Filed:

Jul. 12, 2022
Applicant:

Southwest Petroleum University, Chengdu, CN;

Inventors:

Xiaohua Tan, Chengdu, CN;

Daijin Zhuang, Chengdu, CN;

Mingqing Kui, Chengdu, CN;

Qian Li, Chengdu, CN;

Fei Zhang, Chengdu, CN;

Tao Li, Chengdu, CN;

Zhenglin Mao, Chengdu, CN;

Yan Zhang, Chengdu, CN;

Xiaoping Li, Chengdu, CN;

Miaofeng Cui, Chengdu, CN;

Xian Peng, Chengdu, CN;

Longxin Li, Chengdu, CN;

Xixiang Liu, Chengdu, CN;

Zihan Zhao, Chengdu, CN;

Assignee:
Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/20 (2006.01); E21B 49/08 (2006.01); E21B 47/07 (2012.01);
U.S. Cl.
CPC ...
E21B 43/20 (2013.01); E21B 49/0875 (2020.05); E21B 47/07 (2020.05); E21B 2200/20 (2020.05); E21B 2200/22 (2020.05);
Abstract

The present disclosure relates to a prediction method for constant production decline of a water-producing gas well in a highly heterogeneous reservoir. The prediction method mainly includes: collecting related data of a target water-producing gas well, fitting to obtain a water-drive constant and a water invasion constant, fitting dynamic reserves by adopting a Blasingame plotting method, conducting fitting by adopting a dual-medium model to obtain an elastic storativity ratio and an interporosity flow coefficient, calculating a reservoir heterogeneity coefficient, obtaining a flowing bottomhole pressure at the later stage of stable production, calculating formation pressure of a new day through quantitative production of the target water-producing gas well with 1 day as an iteration stride, performing iteration until the formation pressure is less than or equal to the formation pressure at the end of stable production, and drawing a prediction curve about constant production decline of the target water-producing gas well.


Find Patent Forward Citations

Loading…