The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 17, 2025

Filed:

May. 28, 2020
Applicants:

Basf SE, Ludwigshafen am Rhein, DE;

Thyssenkrupp Ag, Essen, DE;

Thyssenkrupp Uhde Gmbh, Dortmund, DE;

Inventors:

Frederik Scheiff, Ludwigshafen, DE;

Grigorios Kolios, Ludwigshafen, DE;

Andreas Bode, Ludwigshafen, DE;

Assignees:

BASF SE, Ludwigshafen am Rhein, DE;

thyssenkrupp AG, Essen, DE;

thyssenkrupp Uhde GmbH, Dortmund, DE;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/38 (2006.01); C01B 3/24 (2006.01); H02J 3/28 (2006.01); H02J 15/00 (2006.01);
U.S. Cl.
CPC ...
H02J 3/381 (2013.01); C01B 3/24 (2013.01); H02J 3/28 (2013.01); H02J 15/008 (2020.01); C01B 2203/0266 (2013.01); C01B 2203/066 (2013.01); C01B 2203/1241 (2013.01); H02J 2300/30 (2020.01);
Abstract

A method of continuously performing one or more heat-consuming processes, where at least one heat-consuming process is electrically heated. The maximum temperature in the reaction zone of the heat-consuming process is higher than 500° C., at least 70% of products of the heat-consuming process are continuously processed further downstream and/or fed to a local energy carrier network, and the electrical energy required for the heat-consuming process is drawn from an external power grid and from at least one local power source. The local power source is fed by at least one local energy carrier network and by products from the heat-consuming process. The local energy carrier network stores natural gas, naphtha, hydrogen, synthesis gas, and/or steam as energy carrier, and has a total capacity of at least 5 GWh. The local energy carrier network is fed with at least one further product and/or by-product from at least one further chemical process.


Find Patent Forward Citations

Loading…