The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Apr. 21, 2025
Filed:
Oct. 27, 2024
The First Engineering Co., Ltd. of Ctce Group, Hefei, CN;
China Railway No.4 Group Co., Ltd, Hefei, CN;
Jiesheng Zhang, Hefei, CN;
Yangjie Jiang, Hefei, CN;
Fengchun Dong, Hefei, CN;
Wu Huang, Hefei, CN;
Anhui Wang, Hefei, CN;
Shengyun He, Hefei, CN;
Jingyi Li, Hefei, CN;
Shijun Pi, Hefei, CN;
Lingjian Kong, Hefei, CN;
Ning Zhao, Hefei, CN;
Zhuoyi Wei, Hefei, CN;
Shuguo Xu, Hefei, CN;
Ying Wang, Hefei, CN;
Can Jiang, Hefei, CN;
Bo Zhang, Hefei, CN;
Abstract
A top-down construction type assembly construction method for paved road surface, including the following steps: step I, manufacturing prefabricating slabs: using a top-down method to manufacture the prefabricating slabs, and providing bolt sleeves, inside the prefabricating slabs, which are evenly arranged in the prefabricating slabs; step II, mounting the prefabricating slabs: on a lower bearing plate, placing the prefabricating slabs in one step, performing a fine tuning on a position and an altitude of the prefabricating slabs, performing a grouting construction, finally forming the paved road surface; the prefabricating slabs are manufactured by laying bricks and pouring concrete, the prefabricating slabs are rolled over and mounted, thus eliminating on-site concrete bonding between bricks and the lower bearing plate, improving overall stability of the bricks and the prefabricating slabs after being mounted, assembled mounting for a paved road surface is implemented, and the construction period is shortened.