The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 25, 2025

Filed:

Oct. 11, 2019
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Edward Lee McGrath, Greer, SC (US);

Brian J. Theilemann, Ballston Lake, NY (US);

Michael James Rizzo, Glenville, SC (US);

Robert Randall Waara, Simpsonville, SC (US);

Brian Scott Geist, Ballston Spa, NY (US);

Kyle Edward Thompson, Rotterdam, NY (US);

Assignee:

GE Infrastructure Technology LLC, Greenville, SC (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F03D 80/50 (2016.01); F03D 9/25 (2016.01); G01M 13/00 (2019.01); G05B 23/02 (2006.01); G06Q 10/20 (2023.01);
U.S. Cl.
CPC ...
F03D 80/50 (2016.05); F03D 9/257 (2017.02); G01M 13/00 (2013.01); G05B 23/0283 (2013.01); G06Q 10/20 (2013.01);
Abstract

A method for operating and maintaining a wind farm comprising a plurality of wind turbines includes determining an odometer for one or more components of at least one of the pluralities of wind turbines in the wind farm, the odometer representing operational usage of the component(s). The method also includes tracking the operational usage for the component(s) using the odometer and a usage threshold. Further, the method includes predicting an expected time frame for one or more preventative maintenance actions based on a comparison of the tracked operational usage and the usage threshold. Moreover, the method includes triggering scheduling of the one or more preventative maintenance actions when the prediction indicates that the tracked operational usage will exceed the usage threshold. In addition, the method includes shutting down the wind turbine or idling the wind turbine once the one or more preventative maintenance actions are scheduled.


Find Patent Forward Citations

Loading…