The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 14, 2025

Filed:

Mar. 28, 2018
Applicant:

Johnson Controls Technology Company, Auburn Hills, MI (US);

Inventors:

Robert D. Turney, Watertown, WI (US);

Tricia J. Valentine, Glendale, WI (US);

Nicole A. Madison, Milwaukee, WI (US);

Collin W. Eggert, Milwaukee, WI (US);

Carol T. Tumey, Wauwatosa, WI (US);

Michael F. Jaeger, Thiensville, WI (US);

Peter A. Craig, Pewaukee, WI (US);

Assignee:

Tyco Fire & Security GmbH, Schaffhausen, CH;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05B 15/02 (2006.01); F24F 11/30 (2018.01); F24F 11/46 (2018.01); F24F 11/54 (2018.01); F24F 11/58 (2018.01); F24F 11/62 (2018.01); G05B 19/418 (2006.01); G06F 3/04847 (2022.01); F24F 11/47 (2018.01); F24F 11/52 (2018.01); F24F 110/10 (2018.01); F24F 110/20 (2018.01); F24F 110/40 (2018.01); F24F 140/50 (2018.01);
U.S. Cl.
CPC ...
F24F 11/30 (2018.01); F24F 11/46 (2018.01); F24F 11/54 (2018.01); F24F 11/58 (2018.01); F24F 11/62 (2018.01); G05B 15/02 (2013.01); G06F 3/04847 (2013.01); F24F 11/47 (2018.01); F24F 11/52 (2018.01); F24F 2110/10 (2018.01); F24F 2110/20 (2018.01); F24F 2110/40 (2018.01); F24F 2140/50 (2018.01); F24F 2221/54 (2013.01); G05B 19/41865 (2013.01); G05B 2219/25011 (2013.01); Y02P 80/10 (2015.11);
Abstract

An energy plant includes a plurality of subplants, a high level optimizer, a low level optimizer, and a controller. The plurality of subplants include a cogeneration subplant configured to generate steam and electricity and a chiller subplant electrically coupled to the cogeneration subplant and configured to consume the electricity generated by the cogeneration subplant. The high level optimizer is configured to determine recommended subplant loads for each of the plurality of subplants. The recommended subplant loads include a rate of steam production and a rate of electricity production of the cogeneration subplant and a rate of electricity consumption of the chiller subplant. The low level optimizer is configured to determine recommended equipment setpoints for equipment of the plurality of subplants based on the recommended subplant loads. The controller is configured to operate the equipment of the plurality of subplants based on the recommended equipment setpoints.


Find Patent Forward Citations

Loading…