The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 14, 2025

Filed:

Oct. 17, 2023
Applicant:

Safe Crossings, Llc, Jackson, MI (US);

Inventors:

R. Dale Moretz, Jackson, MI (US);

Derek J. Moretz, Seattle, WA (US);

Assignee:

Safe Crossings, LLC, Jackson, MI (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F17D 5/06 (2006.01); F16K 1/20 (2006.01); F16K 3/02 (2006.01); F16K 17/28 (2006.01); F16K 17/32 (2006.01); F16K 31/54 (2006.01); F17D 5/02 (2006.01);
U.S. Cl.
CPC ...
F17D 5/06 (2013.01); F16K 1/20 (2013.01); F16K 3/0254 (2013.01); F16K 17/28 (2013.01); F16K 17/32 (2013.01); F16K 31/54 (2013.01); F17D 5/02 (2013.01);
Abstract

A valve system for controlling a flow of material includes a pipeline including an upstream portion a downstream portion. The system includes a variable flow restrictor configured for providing a restrictive orifice within the pipeline and creating a pressure differential in the flow of material high-pressure material in the upstream portion and low-pressure material in the downstream portion. The system includes a low-pressure tube connected to the downstream portion and a low-pressure chamber connected to the tube and receiving low-pressure material. The chamber includes a secondary flapper configured for selectively blocking the tube. The system includes a primary flapper disposed between the upstream portion and the low-pressure chamber and configured to be disposed in one of a first and second position. The flapper is held in the first position by the pressure differential. The flapper moves to the second position blocking the pipeline when a leak occurs.


Find Patent Forward Citations

Loading…