The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 19, 2024

Filed:

Dec. 04, 2023
Applicant:

Eneos Corporation, Tokyo, JP;

Inventors:

Akihiko Fukunaga, Tokyo, JP;

Toshio Tezuka, Tokyo, JP;

Tadashi Seike, Tokyo, JP;

Hirofumi Nishio, Tokyo, JP;

Daisaku Tateishi, Tokyo, JP;

Assignee:

ENEOS CORPORATION, Tokyo, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H01M 8/04089 (2016.01); B60L 50/70 (2019.01); B60S 5/02 (2006.01); C01B 3/32 (2006.01); H01M 8/04082 (2016.01); H01M 8/0606 (2016.01);
U.S. Cl.
CPC ...
H01M 8/04089 (2013.01); B60S 5/02 (2013.01); C01B 3/32 (2013.01); H01M 8/04201 (2013.01); H01M 8/0606 (2013.01); B60L 50/70 (2019.02); C01B 2203/1604 (2013.01); C01B 2203/1609 (2013.01); H01M 2250/20 (2013.01); Y02T 90/40 (2013.01);
Abstract

A hydrogen production supply system that produces hydrogen gas to be supplied to a hydrogen storage tank, the hydrogen production supply system including a control circuit configured to control an operation load ratio of the hydrogen production apparatus to a predetermined operation load ratio, to increase the operation load ratio of the hydrogen production apparatus to a first operation load ratio larger than the predetermined operation load ratio at first timing, and to decrease the operation load ratio of the hydrogen production apparatus to the predetermined operation load ratio from the first load operation ratio at second timing, wherein an increase in the operation load ratio at the first timing takes precedence over a decrease in the operation load ratio at the second timing.


Find Patent Forward Citations

Loading…