The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 29, 2024

Filed:

Jul. 07, 2022
Applicant:

Tyco Fire & Security Gmbh, Neuhausen am Rheinfall, CH;

Inventors:

Michael J. Wenzel, Oak Creek, WI (US);

Robert D. Turney, Watertown, WI (US);

Jiaqi Li, Beijing, CN;

Matthew J. Ellis, Milwaukee, WI (US);

Mohammad N. Elbsat, Milwaukee, WI (US);

Assignee:

Tyco Fire & Security GmbH, Neuhausen am Rheinfall, CH;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05B 13/04 (2006.01); H04L 41/0826 (2022.01); H04L 43/0811 (2022.01); H04L 43/10 (2022.01); H04L 49/90 (2022.01); H04L 67/10 (2022.01);
U.S. Cl.
CPC ...
G05B 13/041 (2013.01); G05B 13/048 (2013.01); H04L 41/0826 (2013.01); H04L 43/0811 (2013.01); H04L 43/10 (2013.01); H04L 49/90 (2013.01); H04L 67/10 (2013.01);
Abstract

A controller for operating building equipment of a building including processors and non-transitory computer-readable media storing instructions that, when executed by the processors, cause the processors to perform operations including obtaining a first setpoint trajectory from a cloud computation system. The first setpoint trajectory includes setpoints for the building equipment or for a space of the building. The setpoints correspond to time steps of an optimization period. The operations include determining whether a connection between the controller and the cloud computation system is active or inactive at a time step of the optimization period and determining an active setpoint for the time step of the optimization period using either the first or second setpoint trajectory based on whether the connection between the controller and the cloud computation system is active or inactive at the time step. The operations include operating the building equipment based on the active setpoint.


Find Patent Forward Citations

Loading…