The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 03, 2024

Filed:

Nov. 12, 2020
Applicants:

Shaoxing University, Shaoxing, CN;

Zhejiang University City College, Hangzhou, CN;

Inventors:

Yunjin Hu, Shaoxing, CN;

Feng Chen, Shaoxing, CN;

Jiqing Jiang, Shaoxing, CN;

Lianying Zhou, Shaoxing, CN;

Lu Shi, Shaoxing, CN;

Assignees:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
C02F 11/00 (2006.01); B01D 61/42 (2006.01); B01D 61/56 (2006.01); C02F 1/00 (2023.01); E02D 3/10 (2006.01); E02D 3/11 (2006.01);
U.S. Cl.
CPC ...
C02F 11/006 (2013.01); B01D 61/427 (2013.01); B01D 61/56 (2013.01); C02F 11/008 (2013.01); E02D 3/10 (2013.01); E02D 3/11 (2013.01); C02F 2001/007 (2013.01); E02D 2220/00 (2013.01);
Abstract

A device and method for mud solidification based on electro-osmosis well points cooperating with well-points dewatering. The method includes the following steps: 1) preparation; 2) construction of well point pipe positioning frame beams; 3) assembly of a mobile trestle platform; 4) well point pipe arrangement; 5) well point/electro-osmosis dewatering; 6) filtrate treatment; 7) well point pipe dismantling; and 8) excavation and transportation of solidified drilling slag for utilization. According to the disclosure, well point pipes are adopted and used as an anode and a cathode of an electro-osmosis well, and on-site quick solidification of pile foundation mud is implemented through the electro-osmosis combined with light well-points dewatering; by the adoption of the well point pipe positioning frame beams, the problems that drilling slag in a sedimentation tank has a large water content and it is difficult to arrange and fix the well point pipes are well solved.


Find Patent Forward Citations

Loading…