The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 23, 2024

Filed:

Feb. 05, 2021
Applicants:

Saudi Arabian Oil Company, Dhahran, SA;

King Fahd University of Petroleum & Minerals, Dhahran, SA;

Inventors:

Mohammed A. Al-Malki, Dhahran, SA;

Mahmoud F. Abughaban, Dhahran, SA;

Mohammed Murif Al-Rubaii, Dhahran, SA;

Abdullah S. Al-Yami, Dhahran, SA;

Salaheldin M. Elkatatny, Dhahran, SA;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E21B 49/00 (2006.01); E21B 21/08 (2006.01); E21B 37/00 (2006.01); E21B 44/02 (2006.01); E21B 47/12 (2012.01);
U.S. Cl.
CPC ...
E21B 49/003 (2013.01); E21B 21/08 (2013.01); E21B 37/00 (2013.01); E21B 44/02 (2013.01); E21B 47/12 (2013.01); E21B 49/005 (2013.01); E21B 2200/20 (2020.05);
Abstract

A method may include obtaining, in real-time, well data regarding a wellbore and drilling fluid data regarding drilling fluid circulating in the wellbore. The method may further include determining, based on the drilling fluid data, a plastic viscosity (PV) value and a yield point (YP) value regarding the drilling fluid. The method may further include determining, based on the well data and the drilling fluid data, an equivalent circulating density (ECD) value of an annulus of the wellbore. The method may further include determining a hole cleaning efficiency (HCE) value based on a hole cleaning model, the PV value, the YP value, and the ECD value. The method may further include determining an adjusted rate of penetration (ROP) value for a drilling operation in the wellbore based on the HCE value and a current ROP value. The method may further include transmitting a command to a drilling system that produces the adjusted ROP value in the drilling operation.


Find Patent Forward Citations

Loading…