The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jul. 09, 2024

Filed:

Jan. 04, 2021
Applicant:

Etak Systems, Llc, Huntersville, NC (US);

Inventor:

Lee Priest, Charlotte, NC (US);

Assignee:

ETAK Systems, LLC, Huntersville, NC (US);

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
G06T 19/00 (2011.01); B64C 39/02 (2023.01); G06F 18/22 (2023.01); G06F 30/13 (2020.01); G06Q 10/0631 (2023.01); G06Q 50/08 (2012.01); G06T 7/00 (2017.01); G06T 7/55 (2017.01); G06V 20/10 (2022.01); B64U 101/30 (2023.01); H04W 16/18 (2009.01);
U.S. Cl.
CPC ...
B64C 39/024 (2013.01); G06F 18/22 (2023.01); G06F 30/13 (2020.01); G06Q 10/06313 (2013.01); G06Q 50/08 (2013.01); G06T 7/001 (2013.01); G06T 7/55 (2017.01); G06T 19/006 (2013.01); G06V 20/176 (2022.01); B64U 2101/30 (2023.01); G06T 2207/10032 (2013.01); G06T 2207/30108 (2013.01); G06T 2210/04 (2013.01); H04W 16/18 (2013.01);
Abstract

A method for coordinating initiation of a power plant of a telecommunications site is disclosed herein. The method includes receiving construction plans and other project details for the power plant. The method also includes receiving data responsive to an initial site visit with the data representing field conditions of the telecommunications site, the data capture including one or more of photos and videos of existing infrastructure of the telecommunications site selected to receive and interface with the power plant. The method further includes generating one of a 360 degree view and a model of the existing infrastructure selected to receive and interface with the power plant. The method yet further includes ensuring the construction plans match the field conditions including the conditions of the existing infrastructure selected to receive and interface with the power plant and identifying any obstacles to the installation of the power plant.