The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 28, 2024

Filed:

Sep. 16, 2020
Applicants:

Petrochina Company Limited, Beijing, CN;

Sichuan Shengnuo Oil. and Gas Engineering Technology Service Co. Ltd, Deyang, CN;

Inventors:

Weilin Wang, Beijing, CN;

Huiyun Ma, Beijing, CN;

Changqing Ye, Beijing, CN;

Hao Tan, Beijing, CN;

Hanbing Tang, Beijing, CN;

Daogang Cai, Beijing, CN;

Xueqiang Wang, Beijing, CN;

Yukui Hong, Beijing, CN;

Fengjing Sun, Beijing, CN;

Wei Zhou, Beijing, CN;

Ting Zhang, Beijing, CN;

Zonghao Dong, Beijing, CN;

Yan Huang, Beijing, CN;

Yun Miao, Beijing, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/12 (2006.01); E21B 33/12 (2006.01); E21B 33/129 (2006.01);
U.S. Cl.
CPC ...
E21B 43/122 (2013.01); E21B 33/1208 (2013.01); E21B 33/1294 (2013.01);
Abstract

The present invention discloses a permanent packer and an extended gas lift method using the permanent packer, the method comprising: S1. imbedding the extended gas lift embedded pipe when setting the permanent packer, wherein the extended gas lift embedded pipe has an upper end being closed and a lower end being open, is provided therein with a one-way valve through which the fluid can pass from top to bottom; S2. lowering a breaking device from the production casing when in the extended gas lift, to break the upper end of the extended gas lift embedded pipe such that the upper and lower ends of the extended gas lift embedded pipe are communicated; and S3. injecting gas into the production casing, lifting the accumulated liquid in the bottom hole to the ground surface, to complete the extended gas lift. The method does not affect the sealing property of the permanent packer, can fully adapt to the demand in the early and middle stages of gas well development, and meanwhile can realize extended gas lift without workover in the middle and later stages of gas well development, and has low implementation cost and good safety.