The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 23, 2024

Filed:

Feb. 15, 2023
Applicant:

Wobben Properties Gmbh, Aurich, DE;

Inventors:

Ralf Messing, Aurich, DE;

Malte Heyen, Leer, DE;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F03D 7/02 (2006.01); F03D 7/04 (2006.01); F03D 17/00 (2016.01);
U.S. Cl.
CPC ...
F03D 7/0276 (2013.01); F03D 7/049 (2023.08); F03D 17/008 (2023.08); F05B 2270/101 (2013.01); F05B 2270/1031 (2013.01); F05B 2270/1033 (2013.01); F05B 2270/204 (2020.08); F05B 2270/30 (2013.01); F05B 2270/304 (2013.01); F05B 2270/32 (2013.01); F05B 2270/327 (2013.01); F05B 2270/328 (2013.01); F05B 2270/331 (2013.01); F05B 2270/335 (2013.01);
Abstract

A method for operating a wind farm having a first wind power installation and a second wind power installation, to an associated wind power installation and to an associated wind farm. The second wind power installation is located in the wake of the first wind power installation in at least one wake wind direction. A tip-speed coefficient is determined from the ratio of a second tip-speed ratio of the second wind power installation and a first tip-speed ratio of the first wind power installation and a pitch-angle coefficient is determined from the ratio of a second pitch angle of the second wind power installation and a first pitch angle of the first wind power installation. The method comprises: determining a turbulence metric, in particular a turbulence intensity, at the second wind power installation; operating the first wind power installation and the second wind power installation in the wake wind direction in a part-load range, wherein the tip-speed coefficient and/or the pitch-angle coefficient are/is a function of the turbulence metric at the second wind power installation and are/is greater than one.


Find Patent Forward Citations

Loading…