The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 02, 2024

Filed:

Nov. 12, 2021
Applicants:

Electric Power Science & Research Institute of State Grid Tianjin Electric Power Company, Tianjin, CN;

State Grid Tianjin Electric Power Company, Tianjin, CN;

State Grid Corporation of China, Beijing, CN;

Inventors:

Shiqian Ma, Tianjin, CN;

Bin Wu, Tianjin, CN;

Yun Liu, Tianjin, CN;

Xianxu Huo, Tianjin, CN;

Yi Ding, Tianjin, CN;

Lei Wu, Tianjin, CN;

Tianhao Wang, Tianjin, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/00 (2006.01); H02J 3/08 (2006.01);
U.S. Cl.
CPC ...
H02J 3/0073 (2020.01); H02J 3/003 (2020.01); H02J 3/08 (2013.01);
Abstract

A method for making a spatio-temporal combined optimal scheduling strategy of a mobile energy storage (MES) system includes: inputting data of a power system, a traffic system, and an MES system; setting a time interval, and initializing a time interval counter; inputting real-time fault, traffic, and MES data; and performing rolling optimization and solving, and delivering regulation decision instructions of the MES system, till a fault is removed. The core of the present disclosure is to propose a spatio-temporal combined optimal model of the MES system to describe spatio-temporal coupling statuses of an energy storage vehicle, a traffic network, and a power distribution network. The present disclosure provides guidance for an optimal scheduling decision of the MES system by properly regulating a traveling path and charging and discharging power of the MES system, thereby supporting high-reliability operation of the power distribution network.


Find Patent Forward Citations

Loading…