The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Mar. 12, 2024
Filed:
May. 07, 2020
China Railway 14th Bureau Group Co., Ltd., Shandong, CN;
China Railway Siyuan Survey and Design Group Co., Ltd., Hubei, CN;
Jian Chen, Shandong, CN;
Mingqing Xiao, Shandong, CN;
Chengzhen Wang, Shandong, CN;
Xiuting Su, Shandong, CN;
Shuchen Li, Shandong, CN;
Feng Xue, Shandong, CN;
Xiudong Li, Shandong, CN;
Yankun Wu, Shandong, CN;
Wenhao Sun, Shandong, CN;
CHINA RAILWAY 14TH BUREAU GROUP CO., LTD., Shangdong, CN;
CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP CO., LTD., Hubei, CN;
Abstract
A method and apparatus for controlling stratum deformation in a shield construction process, a non-volatile storage medium, and a processor are disclosed. The method includes: monitoring settlement characteristic parameters in a shield construction process; predicting a settlement proportion according to the settlement characteristic parameters, the settlement proportion being a ratio between a predicted settlement value and a corresponding settlement threshold; and determining construction parameters in the shield construction process according to the settlement proportion. In the method, a settlement proportion is predicted through settlement characteristic parameters monitored in a shield construction process, and then appropriate construction parameters are determined according to the settlement proportion, so that the construction parameters in the shield construction process can be corrected in real time, and the safety and scientificity of stratum deformation control in shield construction can be ensured.