The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 05, 2024

Filed:

Apr. 27, 2021
Applicants:

Hitachi, Ltd., Tokyo, JP;

The University of Tokyo, Tokyo, JP;

Inventors:

Naoki Yoshimoto, Tokyo, JP;

Yasunori Akashi, Tokyo, JP;

Shinichi Warisawa, Tokyo, JP;

Jongyeon Lim, Tokyo, JP;

Shohei Miyata, Tokyo, JP;

Assignee:

Hitachi, Ltd., Tokyo, JP;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F24F 11/46 (2018.01); F24F 11/52 (2018.01); F24F 11/54 (2018.01); F24F 120/20 (2018.01); F24F 140/60 (2018.01); F24F 110/10 (2018.01); F24F 110/20 (2018.01); F24F 110/30 (2018.01);
U.S. Cl.
CPC ...
F24F 11/46 (2018.01); F24F 11/52 (2018.01); F24F 11/54 (2018.01); F24F 2110/10 (2018.01); F24F 2110/20 (2018.01); F24F 2110/30 (2018.01); F24F 2120/20 (2018.01); F24F 2140/60 (2018.01);
Abstract

An energy management system is configured to calculate a percentage of satisfied based on the report data for each of the plurality of buildings; create, for each of the plurality of buildings, a plan for operating each of the air-conditioning facilities based on the percentage of satisfied and a predetermined target percentage of satisfied; calculate a first energy consumption amount based on the first piece of data; calculate a second energy consumption amount based on the second piece of data, the third piece of data, and the fourth piece of data, the second energy consumption amount being obtained when the each of the air-conditioning facilities is operated after a lapse of a predetermined time period; and control, when the first energy consumption amount is larger than the second energy consumption amount, the operation of the each of the air-conditioning facilities so as to achieve the second energy consumption amount.


Find Patent Forward Citations

Loading…