The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 05, 2024

Filed:

Nov. 10, 2020
Applicant:

Dr. Ing. H.c. F. Porsche Aktiengesellschaft, Stuttgart, DE;

Inventors:

Raoul Heyne, Wiernsheim, DE;

Alexander Schneider-Schaper, Wiernsheim, DE;

Martin Rezac, Prague, CZ;

Barry Sole, Pforzheim, DE;

Hartmut Chodura, Stuttgart, DE;

Ulf Schlieben, Ditzingen, DE;

Sunny Rohilla, Stuttgart, DE;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B60L 53/68 (2019.01); B60L 53/10 (2019.01); B60L 53/30 (2019.01); B60L 53/51 (2019.01); B60L 53/63 (2019.01); B60L 53/64 (2019.01); B60L 53/66 (2019.01); H02J 3/32 (2006.01); H02J 7/35 (2006.01);
U.S. Cl.
CPC ...
B60L 53/68 (2019.02); B60L 53/11 (2019.02); B60L 53/30 (2019.02); B60L 53/51 (2019.02); B60L 53/63 (2019.02); B60L 53/64 (2019.02); B60L 53/66 (2019.02); B60L 53/665 (2019.02); H02J 3/322 (2020.01); H02J 7/35 (2013.01); B60L 53/305 (2019.02); H02J 2310/60 (2020.01);
Abstract

A load management system for managing loads in a power distribution grid. The load management system includes a control unit and at least two current transformers, which are each connected to the control unit by a signal cable. A first current transformer of the at least two current transformers is arranged in the power distribution grid such that the first current transformer is suitable for measuring a current level that is dominant in a grid connecting line of the power distribution grid, which grid connecting line is connected to a power supply company. A second current transformer of the at least two current transformers is arranged in the power distribution grid such that the second current transformer is suitable for measuring the current level that is dominant in a power line of the power distribution grid, which power line feeds at least one charging station of the power distribution grid.


Find Patent Forward Citations

Loading…