The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 27, 2024

Filed:

May. 26, 2021
Applicant:

Apple Inc., Cupertino, CA (US);

Inventors:

Muhammad Saad, Sachse, TX (US);

Syed A Rahim, Allen, TX (US);

Sharad Garg, Cupertino, CA (US);

Vijay Venkataraman, San Jose, CA (US);

Jia Tang, San Jose, CA (US);

Wenping Lou, San Jose, CA (US);

Thanigaivelu Elangovan, Santa Clara, CA (US);

Pengkai Zhao, San Jose, CA (US);

Tarakkumar G Dhanani, San Jose, CA (US);

Assignee:

Apple Inc., Cupertino, CA (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H04W 36/00 (2009.01); H04W 74/08 (2009.01); H04W 24/04 (2009.01); H04W 76/19 (2018.01);
U.S. Cl.
CPC ...
H04W 36/0079 (2018.08); H04W 24/04 (2013.01); H04W 74/0833 (2013.01); H04W 76/19 (2018.02); H04W 36/0069 (2018.08);
Abstract

Apparatuses, systems, and methods for RACH procedures to avoid excessive handover/secondary cell group failures. A base station may declare a handover and/or secondary cell group (SCG) failure and may determine that a failure threshold has been met. The base station may perform a remedial action in response to meeting the failure threshold. The failure threshold may be multi-dimensional, where a first dimension is associated with a number of handover/SCG failures and where a second dimension is associated with a time period in which the number of handover/SCG failures occurred. Further, a third dimension may be associated with a UE mobility state and a fourth dimension may be associated with whether the UE is using FR1 or FR2. The remedial action in response to meeting the failure threshold may include the base station suspending transmission of measurement object configurations for a specified period of time.


Find Patent Forward Citations

Loading…