The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 27, 2024

Filed:

Mar. 25, 2021
Applicant:

Eneos Corporation, Tokyo, JP;

Inventors:

Akihiko Fukunaga, Tokyo, JP;

Toshio Tezuka, Tokyo, JP;

Tadashi Seike, Tokyo, JP;

Hirofumi Nishio, Tokyo, JP;

Daisaku Tateishi, Tokyo, JP;

Assignee:

ENEOS CORPORATION, Tokyo, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H01M 8/04089 (2016.01); C01B 3/32 (2006.01); H01M 8/04082 (2016.01); H01M 8/0606 (2016.01); B60S 5/02 (2006.01); B60L 50/70 (2019.01);
U.S. Cl.
CPC ...
H01M 8/04089 (2013.01); B60S 5/02 (2013.01); C01B 3/32 (2013.01); H01M 8/04201 (2013.01); H01M 8/0606 (2013.01); B60L 50/70 (2019.02); C01B 2203/1604 (2013.01); C01B 2203/1609 (2013.01); H01M 2250/20 (2013.01); Y02T 90/40 (2013.01);
Abstract

An operation method is provided for a hydrogen production apparatus that is disposed in a hydrogen station and produces hydrogen gas to be supplied to a fuel cell vehicle (FCV) arriving at the hydrogen station. The operation method includes starting up a hydrogen production apparatus up to a first operation load ratio preset for a rated operation. The operation method includes increasing an operation load of the hydrogen production apparatus to a second operation load ratio, which is larger than the first operation load ratio, at first timing associated with an arrival of the FCV, and decreasing the operation load of the hydrogen production apparatus to a third operation load ratio, which is smaller than the second operation load ratio, at second timing associated with a completion of hydrogen filling into the FCV.


Find Patent Forward Citations

Loading…