The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 07, 2023

Filed:

Jul. 01, 2022
Applicant:

Lutron Technology Company Llc, Coopersburg, PA (US);

Inventors:

Steven J. Kober, Center Valley, PA (US);

Soma Sekhara Rao Konijeti, Bengaluru, IN;

Rajesh Krishna Thottumkara, New Milford, NJ (US);

Keertana Veeranki, Bethlehem, PA (US);

Assignee:

Lutron Technology Company LLC, Coopersburg, PA (US);

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
H05B 45/14 (2020.01); H05B 45/3725 (2020.01); H02M 1/36 (2007.01); H05B 45/385 (2020.01); H05B 47/165 (2020.01); H02M 3/335 (2006.01); H05B 45/375 (2020.01); H05B 45/38 (2020.01);
U.S. Cl.
CPC ...
H02M 1/36 (2013.01); H05B 45/14 (2020.01); H05B 45/3725 (2020.01); H05B 45/385 (2020.01); H05B 47/165 (2020.01); H02M 3/33507 (2013.01); H05B 45/375 (2020.01); H05B 45/38 (2020.01);
Abstract

A load control device may be configured to turn on lighting loads to obtain a fast turn-on time that may be substantially consistent across lighting loads that have different load voltages. The load control device may comprise a power converter circuit configured to produce a voltage across a capacitor, and a control circuit configured to control the power converter circuit to generate the voltage across the capacitor. The control circuit may determine a learned voltage from the magnitude of the voltage across the capacitor. For example, the control circuit may measure the magnitude of the voltage and store the measured voltage as the learned voltage. The control circuit may determine an operating parameter for the power converter circuit as a function of the learned voltage, and control the power converter circuit according to the operating parameter to charge the capacitor until the magnitude of the voltage exceeds a threshold.


Find Patent Forward Citations

Loading…