The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 29, 2023

Filed:

Oct. 19, 2021
Applicant:

Milwaukee Electric Tool Corporation, Brookfield, WI (US);

Inventors:

Kevin Minnickel, Mukwonago, WI (US);

Brian Carrillo, Oshkosh, WI (US);

Ryan B. Jipp, Brookfield, WI (US);

Samuel Sheeks, Germantown, WI (US);

Cameron R. Schulz, Milwaukee, WI (US);

Aditya Subramanian, Brookfield, WI (US);

Martin Guerrero, Burlington, WI (US);

Izael Zapata, Burlington, WI (US);

Jorge Michael Chavez, Kenosha, WI (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 7/00 (2006.01); B25C 1/06 (2006.01); H02K 7/14 (2006.01); H02P 4/00 (2006.01); H02J 7/34 (2006.01); B25F 5/02 (2006.01); H01M 50/267 (2021.01); H01M 50/213 (2021.01); H01M 50/249 (2021.01); H01M 50/509 (2021.01); H01M 50/516 (2021.01);
U.S. Cl.
CPC ...
B25C 1/06 (2013.01); B25F 5/02 (2013.01); H01M 50/213 (2021.01); H01M 50/249 (2021.01); H01M 50/267 (2021.01); H02J 7/0031 (2013.01); H02J 7/0063 (2013.01); H02J 7/0068 (2013.01); H02J 7/00712 (2020.01); H02J 7/345 (2013.01); H02K 7/14 (2013.01); H02P 4/00 (2013.01); H01M 50/509 (2021.01); H01M 50/516 (2021.01); H01M 2220/30 (2013.01);
Abstract

A system, an electrical combination and a method for powering a load device. The combination may include a burst circuit configured to provide power to the load device to perform a burst operation, the burst circuit including a supercapacitor, a first switch between a power source and the supercapacitor and operable to control whether power is provided from the power source to charge the supercapacitor, and a second switch between the supercapacitor and the load device and operable to control whether power is provided from the supercapacitor to the load device; and an electronic processor configured to control the first switch and the second switch based at least in part on a voltage of the supercapacitor.


Find Patent Forward Citations

Loading…