The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Aug. 22, 2023
Filed:
Jan. 23, 2020
Applicant:
Daewoo Shipbuilding & Marine Engineering Co., Ltd., Geoje-si, KR;
Inventors:
Hyuk Kwon, Seoul, KR;
Su Kyung An, Gwangmyeong-si, KR;
Seung Woo Jeong, Seoul, KR;
Min Cheol Ryu, Seoul, KR;
Geum Jun Gang, Seoul, KR;
Assignee:
DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD., Geoje-si, KR;
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B63H 21/38 (2006.01); B63H 21/14 (2006.01); F01N 3/20 (2006.01); F02D 19/06 (2006.01); F02D 19/08 (2006.01);
U.S. Cl.
CPC ...
B63H 21/38 (2013.01); B63H 21/14 (2013.01); F01N 3/208 (2013.01); F02D 19/0647 (2013.01); F02D 19/087 (2013.01); F01N 3/206 (2013.01); F01N 3/2066 (2013.01); F01N 2430/04 (2013.01); F01N 2570/18 (2013.01); F01N 2590/02 (2013.01); F01N 2610/02 (2013.01); F01N 2610/03 (2013.01); F01N 2610/04 (2013.01); F01N 2610/10 (2013.01); F01N 2610/102 (2013.01); F01N 2900/04 (2013.01); F01N 2900/14 (2013.01); F01N 2900/1402 (2013.01); F01N 2900/1614 (2013.01); F01N 2900/1616 (2013.01); F01N 2900/1618 (2013.01); F01N 2900/18 (2013.01); F02D 19/0613 (2013.01); F02D 19/0639 (2013.01); F02D 19/0642 (2013.01); F02D 19/0644 (2013.01); F02D 19/081 (2013.01);
Abstract
The present invention provides a fuel supply system, for an eco-friendly ship, which selectively uses an existing fuel and an ammonia fuel or uses a mixture thereof as a fuel for a propulsion engine and a power generation engine of a ship so as to follow ship greenhouse gas regulations to be reinforced in phases at major points until 2050.