The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Apr. 04, 2023
Filed:
Aug. 01, 2018
Moog Gmbh, Boeblingen, DE;
Dirk Becher, Nufringen, DE;
Werner Haendle, Marbach a.N., DE;
Achim Helbig, Stuttgart, DE;
Christoph Boes, Reutlingen, DE;
Moog GmbH, Boeblingen, DE;
Abstract
An electro-hydrostatic drive for realizing a rapid movement during a rapid movement phase, a force-building movement during a force-building movement phase. The apparatus comprises a hydro-machine with variable volume and/or rotational speed, driven by an electric motor, for providing a volume-stream of a hydraulic fluid, a first cylinder with a piston chamber, an rod chamber, and a plunger rod, a reservoir, a pressure source, a relief valve, a check valve, a fluid connection between the piston chamber and the hydro-machine, a fluid connection between the rod chamber and the hydro-machine, a fluid connection between the piston chamber and the reservoir, a fluid connection between the rod-chamber-side port of the hydro-machine and the reservoir, a fluid connection, through the relief valve, between the reservoir and the pressure source. The relief valve is for pressure safety of the reservoir, and the check valve has a fluid connection from the pressure source to the rod-chamber-side port of the hydro-machine, during the rapid movement phase, a first part of the hydraulic fluid is piped through the fluid connection between the piston chamber and the hydro-machine and the fluid connection between the rod chamber and the hydro-machine, and a second part of the hydraulic fluid communicates through the fluid connection between the piston chamber and the reservoir, during the force-building movement phase, a first part of the hydraulic fluid is piped through the fluid connection between the piston chamber and the hydro-machine and the fluid connection between the rod chamber and the hydro-machine, and a second part of the hydraulic fluid is piped through the fluid connection between the rod-chamber-side port of the hydro-machine and the reservoir.