The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Mar. 21, 2023
Filed:
Sep. 14, 2022
Qingdao University of Technology, Qingdao, CN;
Spg Qingdao Port Group Company Limited, Qingdao, CN;
Hohai University, Nanjing, CN;
China University of Petroleum, Qingdao, CN;
Institute of Marine Energy Engineering Technology, China Power Engineering Consulting Group Co., Ltd, Guangzhou, CN;
Innovation Research Institute of Shandong Hi-speed Group Co., Ltd., Jinan, CN;
Zhejiang University, Hangzhou, CN;
Northwest A&f University, Shaanxi, CN;
China Railway Construction Engineering Group Second Construction Co., Ltd., Qingdao, CN;
China Railway Construction Group Co., Ltd., Beijing, CN;
Junwei Liu, Qingdao, CN;
Dongsheng Jeng, Qingdao, CN;
Xianzhang Ling, Qingdao, CN;
Dongliang Xing, Qingdao, CN;
Jisheng Zhang, Nanjing, CN;
Teng Wang, Qingdao, CN;
Dayong Li, Qingdao, CN;
Bo Liu, Guangzhou, CN;
Gongfeng Xin, Jinan, CN;
Zhen Guo, Hangzhou, CN;
Yi Hong, Hangzhou, CN;
Zhengzhong Wang, Shaanxi, CN;
Xiuxia Yu, Qingdao, CN;
Lingyun Feng, Qingdao, CN;
Lin Cui, Qingdao, CN;
Zuodong Liang, Qingdao, CN;
Hongfeng Guang, Qingdao, CN;
Chao Zhang, Qingdao, CN;
Ning Jia, Qingdao, CN;
Guoxiao Zhao, Qingdao, CN;
Rongfu Gao, Beijing, CN;
Ming Fang, Beijing, CN;
Abstract
A pile-side lateral static load device includes a jack system, a liftable jack cart, a loading jack fixing system, and a loading system. The jack system includes a jack body. The jack system is installed on the liftable jack cart through the loading jack fixing system. The loading system is installed on the loading jack fixing system, and the loading system includes counter-pressure loading systems and counter-tension loading systems. The pile-side lateral static load device has a simple structure, is convenient to install and operate, and can complete lateral loading and in-situ tests under different pile diameters, different tonnages and different precisions, so as to facilitate a simulation test of in-situ lateral loading of a pile.