The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 24, 2023

Filed:

Sep. 24, 2019
Applicant:

Storedot Ltd., Herzeliya, IL;

Inventor:

Daniel Aronov, Netanya, IL;

Assignee:

STOREDOT LTD., Herzeliya, IL;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H01M 4/13 (2010.01); H01M 4/58 (2010.01); H01M 2/00 (2006.01); H01M 10/0525 (2010.01); H01M 10/42 (2006.01); B60L 50/60 (2019.01); B60L 53/10 (2019.01); B60L 58/13 (2019.01); B60L 58/18 (2019.01); H02J 7/34 (2006.01); H02J 7/00 (2006.01); H02J 3/32 (2006.01); H01M 10/44 (2006.01);
U.S. Cl.
CPC ...
B60L 50/66 (2019.02); B60L 53/10 (2019.02); B60L 53/11 (2019.02); B60L 58/13 (2019.02); B60L 58/18 (2019.02); H02J 3/322 (2020.01); H02J 7/00041 (2020.01); H02J 7/00714 (2020.01); H02J 7/345 (2013.01); H01M 10/0525 (2013.01); H01M 10/441 (2013.01);
Abstract

Single, internally adjustable modular battery systems are provided, for handling power delivery from and to various power systems such as electric vehicles, photovoltaic systems, solar systems, grid-scale battery energy storage systems, home energy storage systems and power walls. Batteries comprise a main fast-charging lithium ion battery (FC), configured to deliver power to the electric vehicle, a supercapacitor-emulating fast-charging lithium ion battery (SCeFC), configured to receive power and deliver power to the FC and/or to the EV and to operate at high rates within a limited operation range of state of charge (SoC), respective module management systems, and a control unit. Both the FC and the SCeFC have anodes based on the same anode active material and the control unit is configured to manage the FC and the SCeFC and manage power delivery to and from the power system(s), to optimize the operation of the FC.


Find Patent Forward Citations

Loading…