The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 13, 2022

Filed:

Sep. 03, 2019
Applicant:

Utopus Insights, Inc., Valhalla, NY (US);

Inventors:

Soumyadip Ghosh, Peekskill, NY (US);

Dung Phan, Ossining, NY (US);

Assignee:

Utopus Insights, Inc., Valhalla, NY (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05B 13/02 (2006.01); H02J 3/00 (2006.01); H02J 3/14 (2006.01); H02J 3/46 (2006.01); H02J 3/38 (2006.01);
U.S. Cl.
CPC ...
H02J 3/003 (2020.01); G05B 13/026 (2013.01); H02J 3/0075 (2020.01); H02J 3/14 (2013.01); H02J 3/466 (2020.01); H02J 3/381 (2013.01); H02J 2203/20 (2020.01); H02J 2300/20 (2020.01); Y02B 70/3225 (2013.01); Y02E 60/00 (2013.01); Y04S 20/222 (2013.01); Y04S 40/20 (2013.01);
Abstract

A method for operating a power generating facility connected to a power distribution grid having an uncertain power generation condition includes predicting a probabilistic power flow forecast in a transmission line of the power distribution grid for a period of time, wherein the transmission line is electrically coupled to the power generating facility, predicting, using the probabilistic power flow forecast, a probability of congestion over the transmission line of the power distribution grid during the period of time, generating a mitigation plan, including a load adjustment on the transmission line, using the probability of congestion predicted over the transmission line and a thermal limit constraint of the transmission line, wherein the mitigation plan balances load adjustment and an overlimit line capacity on the transmission line, and controlling the power generating facility, using the mitigation plan, to achieve load modification and mitigate the probability of congestion predicted in the transmission line.


Find Patent Forward Citations

Loading…