The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 04, 2022

Filed:

Aug. 31, 2020
Applicant:

Honda Motor Co., Ltd., Tokyo, JP;

Inventors:

Ryo Oshima, Wako, JP;

Nobuyuki Sasaki, Wako, JP;

Mitsuhiro Ito, Wako, JP;

Mio Oshima, Wako, JP;

Yoshihiro Matsunaga, Wako, JP;

Sho Takada, Wako, JP;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G06Q 50/06 (2012.01); G01R 31/367 (2019.01); G01R 31/36 (2020.01); H02J 3/32 (2006.01); H02J 3/38 (2006.01); H02J 13/00 (2006.01); G01R 31/42 (2006.01); H02J 3/46 (2006.01); H02J 7/00 (2006.01); H02J 3/00 (2006.01);
U.S. Cl.
CPC ...
G06Q 50/06 (2013.01); G01R 31/367 (2019.01); G01R 31/3648 (2013.01); G01R 31/42 (2013.01); H02J 3/32 (2013.01); H02J 3/322 (2020.01); H02J 3/38 (2013.01); H02J 3/472 (2020.01); H02J 7/0013 (2013.01); H02J 7/00034 (2020.01); H02J 7/00045 (2020.01); H02J 7/0071 (2020.01); H02J 13/00004 (2020.01); H02J 13/00022 (2020.01); H02J 3/003 (2020.01); H02J 3/004 (2020.01); H02J 13/00028 (2020.01); H02J 2310/48 (2020.01);
Abstract

A management device is connected to an AC power line provided with a plurality of connection ports, each of which can be connected to an electric device including a power storage unit. The management device includes a measurement unit configured to measure an electric signal on the AC power line, a determination unit configured to determine a type of the electric device connected to the AC power line via a connection port in the plurality of connection ports based on a measurement result of the measurement unit, and a first prediction unit configured to predict an amount of power supply on the AC power line due to discharge of the power storage unit based on a determination result of the determination unit.


Find Patent Forward Citations

Loading…