The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 04, 2022

Filed:

Jun. 18, 2020
Applicant:

Huawei Cloud Computing Technologies Co., Ltd., Guizhou, CN;

Inventors:

Xiangyang Wu, Xi'an, CN;

Zhi Zhao, Xi'an, CN;

Rong Chen, Boulogne Billancourt, FR;

Xuan Jiang, Xi'an, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G06F 11/00 (2006.01); G06F 11/20 (2006.01); H04L 43/0852 (2022.01); H04L 41/0663 (2022.01); G06F 11/14 (2006.01); G06F 9/455 (2018.01); H04L 41/0668 (2022.01); H04L 67/10 (2022.01);
U.S. Cl.
CPC ...
G06F 11/2025 (2013.01); G06F 9/45558 (2013.01); G06F 11/1464 (2013.01); H04L 41/0663 (2013.01); H04L 41/0668 (2013.01); H04L 43/0852 (2013.01); H04L 67/10 (2013.01); G06F 2009/45579 (2013.01); G06F 2009/45595 (2013.01); G06F 2201/815 (2013.01); G06F 2201/82 (2013.01);
Abstract

A redundancy method includes that a first disaster management function (DMF) device on a first site side receives a first request including identification information of a first virtual machine (VM) and a recovery point objective (RPO), allocates a maximum allowable delay time to each node that input/output (IO) data of the first VM passes through in a redundancy process, and sends a second request to a second DMF device on a second site side. The second request includes a maximum allowable delay time of a second replication gateway function (RGF) device on the second site side, and a maximum allowable delay time of an IO writer function (IOWF) device on the second site side and requests the second site side to perform redundancy on the first VM. Hence, the RPO requirements of the tenants can be satisfied in an entire redundancy process.


Find Patent Forward Citations

Loading…