The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 23, 2022

Filed:

Oct. 01, 2020
Applicant:

Spm Oil & Gas Inc., Fort Worth, TX (US);

Inventors:

Brian C. Witkowski, Fort Worth, TX (US);

Nadiya Fuller, Plano, TX (US);

Nuder Said, Fort Worth, TX (US);

Duc Thanh Tran, Spring, TX (US);

Peter Walter, Fort Worth, TX (US);

Assignee:

SPM Oil & Gas Inc., Fort Worth, TX (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 33/068 (2006.01); F04B 15/02 (2006.01); F04B 23/04 (2006.01); F04B 47/00 (2006.01); B01F 23/43 (2022.01); B01F 27/05 (2022.01); E21B 33/038 (2006.01); E21B 43/26 (2006.01); F16K 5/04 (2006.01); F16K 11/048 (2006.01); F16K 31/126 (2006.01); F04B 23/06 (2006.01); F16L 41/03 (2006.01); B01F 101/49 (2022.01); F16K 5/00 (2006.01); F16K 11/00 (2006.01);
U.S. Cl.
CPC ...
E21B 33/068 (2013.01); B01F 23/43 (2022.01); B01F 27/05 (2022.01); E21B 33/038 (2013.01); E21B 43/26 (2013.01); F04B 15/02 (2013.01); F04B 23/04 (2013.01); F04B 23/06 (2013.01); F04B 47/00 (2013.01); F16K 5/04 (2013.01); F16K 11/048 (2013.01); F16K 31/126 (2013.01); F16L 41/03 (2013.01); B01F 2101/49 (2022.01); F16K 5/00 (2013.01); F16K 11/00 (2013.01);
Abstract

An apparatus according to which a subterranean formation in which a wellbore extends is hydraulically fractured, the apparatus comprising first and second manifolds, the first manifold including first and second flow lines adapted to be in fluid communication with first and second pumps, respectively, the first pump being adapted to pressurize fluid received from the first flow line, and the second pump being adapted to pressurize fluid received from the second flow line, and the second manifold including a third flow line adapted to convey pressurized fluid from the first and second pumps to the wellbore to hydraulically fracture the subterranean formation in which the wellbore extends. The apparatus is adapted to be connected to another apparatus used to hydraulically fracture the subterranean formation in which the wellbore extends by moving one, or both, of the first and second flow lines relative to the third flow line.


Find Patent Forward Citations

Loading…