The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 09, 2022

Filed:

Nov. 19, 2020
Applicants:

Yangtze University, Jingzhou, CN;

Jingzhou Modern Petroleum Technology Development Co. Ltd, Jingzhou, CN;

Inventors:

Weichu Yu, Jingzhou, CN;

Ying Zhang, Jingzhou, CN;

Rui Li, Jingzhou, CN;

Hui Zhao, Wuhan, CN;

Lei Zhang, Wuhan, CN;

Wenjie Xia, Tianjin, CN;

Pingtian Fan, Yanan, CN;

Baocheng Wu, Karamay, CN;

Wenming Shu, Jingzhou, CN;

Fei Ding, Qingdao, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/20 (2006.01); E21B 33/138 (2006.01); E21B 43/267 (2006.01); E21B 49/00 (2006.01);
U.S. Cl.
CPC ...
E21B 43/267 (2013.01); E21B 33/138 (2013.01); E21B 49/00 (2013.01);
Abstract

Disclosed is a method for determining three-dimensional in-situ stress based on displacement measurement of borehole wall, including the following steps: pumping the prefluid and the sand-carrying fluid into the target interval, and injecting the biological oil displacement agent into the target interval in sequence; pumping temporary plugging agent into the target layer to implement crack plugging diverting; pumping the sand-carrying liquid into the target interval, and injecting the biological oil displacement agent into the target interval. The beneficial effect of the technical scheme proposed in this disclosure is: by injecting oil displacement agent to fracturing fluid, the temporary plugging diverting fracturing is integrated constructed with enhanced oil recovery, at the same time, it can overcome the incomplete removal of temporary plugging agent and the water lock effect of fracturing fluid caused by diverting fracturing.


Find Patent Forward Citations

Loading…