The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Jul. 05, 2022
Filed:
Jun. 24, 2020
Jun Wang, Wenzhou, CN;
Hongtao Fu, Wenzhou, CN;
Yuanqiang Cai, Wenzhou, CN;
Peng Wang, Wenzhou, CN;
Guohui Yuan, Wenzhou, CN;
Jinqiang Jin, Wenzhou, CN;
Haidong Xu, Wenzhou, CN;
Zhengde Xia, Wenzhou, CN;
Junfeng NI, Wenzhou, CN;
Ziyang Ggao, Wenzhou, CN;
Qiang YE, Wenzhou, CN;
Youchang LV, Wenzhou, CN;
Zhi Guan, Wenzhou, CN;
Ziwu Jiang, Wenzhou, CN;
Zhijian Chen, Wenzhou, CN;
Jun Wang, Wenzhou, CN;
Hongtao Fu, Wenzhou, CN;
Yuanqiang Cai, Wenzhou, CN;
Peng Wang, Wenzhou, CN;
Guohui Yuan, Wenzhou, CN;
Jinqiang Jin, Wenzhou, CN;
Haidong Xu, Wenzhou, CN;
Zhengde Xia, Wenzhou, CN;
Junfeng Ni, Wenzhou, CN;
Ziyang Ggao, Wenzhou, CN;
Qiang Ye, Wenzhou, CN;
Youchang Lv, Wenzhou, CN;
Zhi Guan, Wenzhou, CN;
Ziwu Jiang, Wenzhou, CN;
Zhijian Chen, Wenzhou, CN;
Wenhou University, Wenzhou, CN;
Abstract
A horizontal-vertical drain board-flocculation vacuum preloading sediment treatment method, including (1) electro-osmotic electrodes disposed on the top and bottom of each reinforcing bar of the reinforced frame; (2) after the sediment is blown to the bottommost layer of vacuum preloading tank, the support is fitted over each reinforced frame, and the clips are fastened; (3) the transverse drain board passes through the support, one end of transverse drain board is connected to a curved tube; (4) repeat Step 2 and Step 3 until the sediment is blown to the surface layer of vacuum preloading tank; (5) a vertical drain board is arranged vertically between two adjacent rows of reinforced frames; (6) the curved tube is connected to the first junction block through the second junction block, and then the geotextile and sealing film are laid, the vacuum pump and power supply are switched on at last.