The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 28, 2022

Filed:

Dec. 09, 2021
Applicant:

Southwest Petroleum University, Chengdu, CN;

Inventors:

Xiang Zhou, Chengdu, CN;

Qi Jiang, Chengdu, CN;

Yongchao Wang, Chengdu, CN;

Jie He, Chengdu, CN;

Chunsheng Yu, Chengdu, CN;

Siyuan Huang, Chengdu, CN;

Yang Zhang, Chengdu, CN;

Jiali Liu, Chengdu, CN;

Fangjie Wu, Chengdu, CN;

Guoqiang Tian, Chengdu, CN;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/16 (2006.01); E21B 43/267 (2006.01);
U.S. Cl.
CPC ...
E21B 43/164 (2013.01); E21B 43/166 (2013.01); E21B 43/267 (2013.01);
Abstract

The invention discloses an integrated method for nitrogen-assisted carbon dioxide fracturing and development of shale oil reservoirs, comprising the following steps: fracture the target shale reservoir with nitrogen-assisted carbon dioxide; after fracturing, firstly inject carbon dioxide gas into the target shale oil reservoir, and then inject nitrogen gas to push the carbon dioxide gas into the further location of the oil reservoir; shut in the well in the target shale oil reservoir; after shut-in, open the well to implement depletion production; after the first cycle of production, the slug volume of the injected gas and the shut-in time are 1.5 times of those in the previous cycle in the subsequent production, and Steps 5 to 7 are repeated for each cycle. The present invention maximizes the recovery efficiency of shale oil reservoirs; in this way, carbon dioxide gas can be used most efficiently, making the development of shale reservoir more economical and efficient; the integrated fracturing and development design enables the field operation to be streamlined and standardized, and thus different departments to cooperate each other closer.


Find Patent Forward Citations

Loading…