The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 07, 2022

Filed:

Jul. 31, 2020
Applicants:

Beijing Sifang Automation Co., Ltd., Beijing, CN;

Beijing Sifang Engineering Co., Ltd., Beijing, CN;

Inventors:

Gang Duan, Beijing, CN;

Xiaonan Lou, Beijing, CN;

Qi Zhang, Beijing, CN;

Yuhan Zhang, Beijing, CN;

Nian Liu, Beijing, CN;

Liangliang Zheng, Beijing, CN;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H02J 13/00 (2006.01);
U.S. Cl.
CPC ...
H02J 13/0004 (2020.01); H02J 13/00002 (2020.01); H02J 13/00007 (2020.01); H02J 13/00016 (2020.01);
Abstract

The disclosure provides a method for fast reconfiguration of power supply grid in tens of milliseconds after power grid failure. The master station of fast reconfiguration of power grid concentrates the network status information from the client stations at transformer substations or power plants, and compares it with the built-in control strategy table which deals with possible faults. When an expected power gird disconnection fault is detected, the pre-start switch-on instruction is sent to the client stations with multiple breakers which can reconnect the grid. When the fault is cleared, the client stations shall identify the fault clearing time according to the local information, and send the instruction of synchronous switch-on to the corresponding local breakers which can reconnect the separated grids. At the same time, the master station independently monitors the removal of the fault, and sends the backup switch-on signal with synchronism check to the corresponding breakers which can reconnect the separated grids. Based on the above mechanism, the disconnected grid can be reconnected within 150 ms after disconnecting. After the interconnection of the grid is restored, the breakers that form the electromagnetic ring network switch off.