The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 03, 2022

Filed:

Oct. 30, 2019
Applicant:

Halliburton Energy Services, Inc., Houston, TX (US);

Inventors:

Ajish Potty, Missouri City, TX (US);

Chaitanya Karale, Houston, TX (US);

Ubong Inyang, Humble, TX (US);

Assignee:
Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
E21B 43/267 (2006.01); C09K 8/62 (2006.01); E21B 47/00 (2012.01); E21B 49/00 (2006.01); C09K 8/80 (2006.01); E21B 43/26 (2006.01); E21B 41/00 (2006.01);
U.S. Cl.
CPC ...
E21B 43/267 (2013.01); C09K 8/62 (2013.01); C09K 8/80 (2013.01); E21B 41/0092 (2013.01); E21B 47/00 (2013.01); E21B 49/00 (2013.01);
Abstract

Methods and systems for monitoring and controlling a hydraulic fracturing operation to generate a real-time treatment plan are provided. The methods of the present disclosure include providing a treatment fluid; introducing the treatment fluid into a wellbore penetrating at least a first portion of a subterranean formation at or above a pressure sufficient to create or enhance one or more formation entry points in the subterranean formation; measuring one or more properties of the treatment fluid or downhole conditions within the subterranean formation; creating a treatment plan substantially in real-time including one or more plans selected from the group consisting of: a proppant placement plan, a fluid placement plan, a completion plan, and any combination thereof, wherein the treatment plan is based at least partially on the one or more properties of the treatment fluid or downhole conditions; and treating at least the first portion of the subterranean formation in accordance with the treatment plan.


Find Patent Forward Citations

Loading…