The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 03, 2022

Filed:

Jun. 03, 2020
Applicants:

Infrastructure Renewal Institute of Southern China, Guangdong, CN;

Welead Infrastructure Engineering Technology (Zhengzhou), Ltd., Henan, CN;

Inventors:

Fuming Wang, Guangdong, CN;

Hongyuan Fang, Guangdong, CN;

Yanhui Pan, Henan, CN;

Peng Zhao, Henan, CN;

Chengchao Guo, Henan, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E02D 17/04 (2006.01); F16L 55/18 (2006.01); E02D 29/12 (2006.01); E02D 29/02 (2006.01);
U.S. Cl.
CPC ...
E02D 17/04 (2013.01); E02D 29/121 (2013.01); F16L 55/18 (2013.01); E02D 29/0266 (2013.01); E02D 2200/1621 (2013.01); E02D 2200/1642 (2013.01); E02D 2300/002 (2013.01); E02D 2300/0029 (2013.01); E02D 2600/20 (2013.01);
Abstract

A method for constructing an assembled recyclable rectangular working well with preset detachable door openings comprises steps of: (I) designing according to functional requirements for a rectangular working well; (II) constructing by supporting piles; (III) installing prefabricated top beam; (IV) edge protection construction; (V) alternate construction of earthwork excavation, retaining slabs and internal support breast beams; (VI) installing the ladder entering the rectangular working well; (VII) rectangular working well back cover; (VIII) demolition of the detachable subsection support piles in the door part and completing the construction of the assembled recyclable rectangular working well in the preset detachable door hole; (IX) after the operation in the well is completed, during the backfilling process of the rectangular working well, gradually recovering the working well components such as the retaining slab, the internal support girder, the prefabricated crown beam and the supporting piles.