The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 26, 2022

Filed:

Apr. 17, 2020
Applicant:

Daikin Industries, Ltd., Osaka, JP;

Inventors:

Yasunori Okamoto, Osaka, JP;

Naotoshi Fujita, Osaka, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F24F 11/64 (2018.01); F24F 11/46 (2018.01); G06N 20/00 (2019.01); G05B 19/042 (2006.01); F24F 110/10 (2018.01); F24F 110/20 (2018.01); F24F 110/22 (2018.01); F24F 140/00 (2018.01); F24F 140/60 (2018.01); F24F 110/12 (2018.01);
U.S. Cl.
CPC ...
F24F 11/64 (2018.01); F24F 11/46 (2018.01); G05B 19/042 (2013.01); G06N 20/00 (2019.01); F24F 2110/10 (2018.01); F24F 2110/12 (2018.01); F24F 2110/20 (2018.01); F24F 2110/22 (2018.01); F24F 2140/00 (2018.01); F24F 2140/60 (2018.01); G05B 2219/2614 (2013.01);
Abstract

An air-conditioning system includes an outside air conditioning device, an air conditioning device, and a machine learning apparatus, and includes a state variable acquiring unit configured to acquire state variables, a learning unit configured to perform learning by associating the state variables with at least either an operating capacity of the outside air conditioning device or an operating capacity of the air conditioning device, and a reward calculating unit configured to calculate a reward that correlates with a total of energy consumption of the outside air conditioning device and energy consumption of the air conditioning device. The learning unit performs the learning by using the reward calculated in a period determined in accordance with a time duration until the total of the energy consumption changes after at least either the operating capacity of the outside air conditioning device or the operating capacity of the air conditioning device has changed.


Find Patent Forward Citations

Loading…