The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 19, 2022

Filed:

Jul. 20, 2020
Applicants:

Shandong University of Science and Technology, Qingdao, CN;

China Communications Construction Co., Ltd, Beijing, CN;

Qingdao West Coast Rail Transit Co., Ltd, Qingdao, CN;

Qingdao First Municipal Engineering Co., Ltd, Qingdao, CN;

Hebei Feipu Environmental Protection Technology Co., Ltd, Shijiazhuang, CN;

Inventors:

Xianghui Meng, Qingdao, CN;

Shibin Jiang, Qingdao, CN;

Weizhou Li, Qingdao, CN;

Hailiang Wang, Qingdao, CN;

Fu Yu, Qingdao, CN;

Wensheng He, Qingdao, CN;

Quanwei Liu, Qingdao, CN;

Chuan Li, Qingdao, CN;

Zhenbiao Wang, Qingdao, CN;

Lin Xin, Qingdao, CN;

Biao Kong, Qingdao, CN;

Xiangbao Meng, Qingdao, CN;

Yong Zhang, Qingdao, CN;

Wenming Zhang, Qingdao, CN;

Lide Hou, Qingdao, CN;

Jiufang Xiong, Qingdao, CN;

Xuanshan Zhang, Qingdao, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21D 19/00 (2006.01); E21D 11/10 (2006.01); E21D 11/15 (2006.01); E21D 11/18 (2006.01); E21D 15/44 (2006.01);
U.S. Cl.
CPC ...
E21D 11/10 (2013.01); E21D 11/152 (2013.01); E21D 11/18 (2013.01); E21D 15/44 (2013.01);
Abstract

A method of treating tunnel collapse includes leveling a collapse body and moving a pavilion support under the collapse cavity, lifting a shield plate until a lower edge of the shield plate surpasses a contour line of an initial supporting arch of a tunnel, connecting a bottom column and inserting a padding plate under a column. If the hydraulic prop retracts, the column, the bottom column, the padding plate and the hydraulic prop bear a load from the shield plate. Mounting and connecting the initial supporting arch, welding the intersection point of the column and the initial supporting arch, cutting off the column in the initial supporting arch. Transferring the load of the shield plate from the pavilion support to an initial supporting shed, spraying fast-setting concrete to a grid arch to form a closed shell, and pumping filling material to fill the space of the collapse cavity.


Find Patent Forward Citations

Loading…