The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 15, 2022

Filed:

Nov. 26, 2019
Applicants:

State Grid Jiangsu Electric Power Co., Ltd Nanjing Power Supply Company, Jiangsu, CN;

Shanghai Jiao Tong University, Shanghai, CN;

Hohai University, Jiangsu, CN;

State Grid Jiangsu Electric Power Co., Ltd, JiangSu, CN;

Inventors:

Yong Zhang, Jiangsu, CN;

Zhoujun Ma, Jiangsu, CN;

Ming Zhang, Jiangsu, CN;

Wentao Huang, Shanghai, CN;

Shigang Dai, Shanghai, CN;

Yuping Zheng, Jiangsu, CN;

Nengling Tai, Shanghai, CN;

Chunning Wang, Jiangsu, CN;

Liwei Wang, Jiangsu, CN;

Honghua Xu, Jiangsu, CN;

Yiru Chen, Jiangsu, CN;

Di Ma, Jiangsu, CN;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H02J 3/32 (2006.01); B01J 19/08 (2006.01); B01J 19/10 (2006.01);
U.S. Cl.
CPC ...
H02J 3/32 (2013.01); B01J 19/081 (2013.01); B01J 19/087 (2013.01); B01J 19/10 (2013.01);
Abstract

Disclosed are a method and apparatus for smoothing a link-line power of an electrothermal microgrid using a thermal storage heat pump cluster. The method includes: determining a current link-line power control target and pre-distributing a smoothing task to the heat pump cluster; making, by a heat pump start-stop control layer cluster, a heat pump cluster start-stop scheme, determining a start-stop state of the heat pump cluster and a start-stop smoothing component of the heat pump cluster according to the smoothing task, obtaining a remaining fluctuating power based on link-line fluctuating power and the start-stop smoothing component of the heat pump cluster; smoothing, by a heat pump cluster power adjustment layer, some medium and low frequency components and outputting a smoothing component of the heat pump cluster with respect to a storage battery output optimization target based on the remaining fluctuating power; and simultaneously undertaking, by the storage battery, a smoothing task of the remaining fluctuating power and outputting a storage battery smoothing component to complete the smoothing of the fluctuating power in a control cycle.


Find Patent Forward Citations

Loading…