The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 08, 2022

Filed:

Nov. 07, 2018
Applicants:

Mitsubishi Power Americas, Inc., Lake Mary, FL (US);

Mitsubishi Power, Ltd., Yokohama, JP;

Inventors:

Scott Cloyd, Howey-in-the-Hills, FL (US);

Jiro Asakuno, Hyogo-ken, JP;

Toshihiko Toyota, Hyogo-ken, JP;

Masaru Takamatsu, Hyogo-ken, JP;

Michael Ducker, Gibsonia, PA (US);

David Hunt, DeLand, FL (US);

Assignees:

Mitsubishi Power Americas, Inc., Lake Mary, FL (US);

Mitsubishi Power, Ltd., Yokohama, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F01K 23/10 (2006.01); F02C 6/18 (2006.01); F01K 7/16 (2006.01); F01K 13/02 (2006.01); F22B 1/18 (2006.01);
U.S. Cl.
CPC ...
F01K 23/101 (2013.01); F02C 6/18 (2013.01); F01K 7/16 (2013.01); F01K 13/02 (2013.01); F05D 2220/31 (2013.01); F05D 2220/72 (2013.01); F05D 2220/76 (2013.01); F05D 2260/2322 (2013.01); F05D 2270/303 (2013.01); F22B 1/1815 (2013.01);
Abstract

A power plant system can comprise a first gas turbine having a first efficiency to produce a first exhaust flow, a first electrical generator driven by the first gas turbine, a first heat recovery steam generator to receive the first exhaust flow and generate a first steam flow, a second gas turbine having a second efficiency less than the first efficiency to produce a second exhaust flow, a second electrical generator driven by the second gas turbine, and an exhaust gas conditioning device to reduce temperature of the second exhaust flow, a steam turbine driving a steam electrical generator to receive the first steam flow. The second gas turbine can be selectively operated to generate electricity with the second electrical generator under peak loading conditions when a sum of output from the steam electrical generator and the first electrical generator are less than an electrical demand from a grid.


Find Patent Forward Citations

Loading…