The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 08, 2022

Filed:

Feb. 11, 2019
Applicant:

Concept Laser Gmbh, Lichtenfels, DE;

Inventor:

Kai Hertel, Breitengüßbach, DE;

Assignee:

CONCEPT LASER GMBH, Lichtenfels, DE;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B22F 10/20 (2021.01); B29C 64/153 (2017.01); B29C 64/364 (2017.01); B33Y 40/00 (2020.01); B29C 64/393 (2017.01); B33Y 10/00 (2015.01); B33Y 30/00 (2015.01); B33Y 50/02 (2015.01); B23K 26/342 (2014.01); B29C 64/386 (2017.01); B22F 10/30 (2021.01);
U.S. Cl.
CPC ...
B22F 10/20 (2021.01); B29C 64/153 (2017.08); B29C 64/364 (2017.08); B29C 64/393 (2017.08); B33Y 40/00 (2014.12); B22F 10/30 (2021.01); B23K 26/342 (2015.10); B29C 64/386 (2017.08); B33Y 10/00 (2014.12); B33Y 30/00 (2014.12); B33Y 50/02 (2014.12);
Abstract

Method for additively manufacturing at least one three-dimensional object, whereby a process gas stream streams across the build plane (BP), whereby the process gas stream is adapted to transport respective fume particles from a layer of build material () which are generated during selective irradiation and consolidation of the respective layer of build material (); wherein it is determined that the process gas stream fulfils a pre-definable or pre-defined scheduling criterion; wherein the start time for starting irradiating and consolidating of a first area (A) and/or the start time for starting irradiating and consolidating the at least one further area (A, An) is determined on the basis of the determination that the process gas stream has fulfilled the pre-definable or pre-defined scheduling criterion.


Find Patent Forward Citations

Loading…