The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 15, 2022

Filed:

Jul. 20, 2020
Applicants:

Shandong University of Science and Technology, Qingdao, CN;

China Communications Construction Co., Ltd, Beijing, CN;

Hebei Feipu Environmental Protection Technology Co. Ltd, Shijiazhuang, CN;

Qingdao West Coast Rail Transit Co., Ltd, Qingdao, CN;

Qingdao First Municipal Engineering Co., Ltd, Qingdao, CN;

Inventors:

Lin Xin, Qingdao, CN;

Shibin Jiang, Qingdao, CN;

Fu Yu, Qingdao, CN;

Hailiang Wang, Qingdao, CN;

Weizhou Li, Qingdao, CN;

Quanwei Liu, Qingdao, CN;

Wensheng He, Qingdao, CN;

Chuan Li, Qingdao, CN;

Zhenbiao Wang, Qingdao, CN;

Biao Kong, Qingdao, CN;

Xiangbao Meng, Qingdao, CN;

Yong Zhang, Qingdao, CN;

Wenming Zhang, Qingdao, CN;

Lide Hou, Qingdao, CN;

Jiufang Xiong, Qingdao, CN;

Xuexiang Xu, Qingdao, CN;

Shuai Wang, Qingdao, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21D 11/00 (2006.01); E21D 11/10 (2006.01); E21D 15/44 (2006.01); E21D 11/18 (2006.01); E21D 19/04 (2006.01);
U.S. Cl.
CPC ...
E21D 11/105 (2013.01); E21D 11/183 (2013.01); E21D 15/44 (2013.01); E21D 19/04 (2013.01);
Abstract

A method of treating tunnel collapse includes mounting a shield plate, a column, a support column to form a combined support and moving the combined support onto an operation platform, lifting up the combined support, and enabling the height of canopy to be greater than the height of an initial supporting arch. Actively contacting a surface of a collapse cavity by a fixed support column and bearing a load, and lifting a movable support column to the top of the collapse cavity and bearing a load. Mounting an initial supporting arch, and welding the initial supporting arch with the support column. Removing a hydraulic prop after the support column contacting the initial supporting arch is cut off and the load of the shield plate is transferred to a supporting shed. Mounting an exhaust pipe and a filling material pumping pipe, and pumping a filling material into a collapse cavity space.


Find Patent Forward Citations

Loading…