The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 25, 2022

Filed:

Sep. 05, 2019
Applicant:

Doosan Heavy Industries & Construction Co., Ltd., Changwon-si, KR;

Inventors:

Sang Gun Na, Yongin-si, KR;

Jwa Young Maeng, Yongin-si, KR;

Hyun Sik Kim, Gimpo-si, KR;

Jee Hun Park, Gwangmyeong-si, KR;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G06Q 10/04 (2012.01); G05B 13/04 (2006.01); G05B 17/02 (2006.01);
U.S. Cl.
CPC ...
G06Q 10/04 (2013.01); G05B 13/042 (2013.01); G05B 13/048 (2013.01); G05B 17/02 (2013.01);
Abstract

A system for controlling a boiler apparatus in a power plant to combust under optimized conditions, and a method for optimizing combustion of the boiler apparatus using the same are provided. The boiler control system may include a task manager configured to collect information on a current operating state of a boiler and determine whether to perform a combustion optimization operation for the boiler, a pre-processor configured to preprocess data collected from the boiler and supply the pre-processed data, a modeler configured to create a boiler combustion model on the basis of the pre-processed data received from the pre-processor, an optimizer configured to receive the boiler combustion model from the modeler and perform the combustion optimization operation for the boiler using the boiler combustion model to calculate an optimum control value, wherein the pre-processed data is supplied to the modeler and the optimizer by the pre-processor, and an output controller configured to receive the optimum control value from the optimizer and control an operation of the boiler by reflecting the optimum control value to a boiler control logic.