The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 25, 2022

Filed:

Jun. 25, 2019
Applicant:

Westinghouse Air Brake Technologies Corporation, Pittsburgh, PA (US);

Inventors:

Santosh Sambamoorthy Veda, Niskayuna, NY (US);

Robert Dean King, Schenectady, NY (US);

Irene Michelle Berry, Niskayuna, NY (US);

Zhi Zhou, Bethlehem, NY (US);

Matthew Christian Nielsen, Niskayuna, NY (US);

Lembit Salasoo, Niskayuna, NY (US);

Assignee:
Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
G05F 1/66 (2006.01); G06F 1/26 (2006.01); H02J 3/00 (2006.01); G05F 1/70 (2006.01); G06Q 50/06 (2012.01); H02J 3/38 (2006.01); H02J 3/32 (2006.01); H02J 13/00 (2006.01); H02J 3/14 (2006.01); H02J 3/16 (2006.01); H02J 7/00 (2006.01);
U.S. Cl.
CPC ...
G05F 1/66 (2013.01); G05F 1/70 (2013.01); G06F 1/26 (2013.01); G06Q 50/06 (2013.01); H02J 3/008 (2013.01); H02J 3/14 (2013.01); H02J 3/16 (2013.01); H02J 3/32 (2013.01); H02J 3/382 (2013.01); H02J 7/0021 (2013.01); H02J 13/0006 (2013.01); H02J 13/0062 (2013.01); H02J 3/003 (2020.01); Y02B 70/30 (2013.01); Y02B 90/20 (2013.01); Y02E 40/70 (2013.01); Y02E 60/00 (2013.01); Y02P 80/10 (2015.11); Y02T 10/7072 (2013.01); Y02T 90/12 (2013.01); Y02T 90/14 (2013.01); Y02T 90/16 (2013.01); Y02T 90/167 (2013.01); Y04S 10/123 (2013.01); Y04S 10/50 (2013.01); Y04S 20/12 (2013.01); Y04S 20/221 (2013.01); Y04S 30/12 (2013.01); Y04S 50/10 (2013.01);
Abstract

A system includes a control unit having one or more processors and a communication interface. The communication interface is configured to communicate with one or more charging stations that are electrically coupled to receive electrical power from a power distribution grid and that are configured to selectively charge one or more energy storage devices connected to the charging stations. The one or more processors are configured to generate first control signals for communication by the communication interface to the one or more charging stations to control transfer of reactive and/or active power from the charging stations to the power distribution grid. The control signals are generated based at least in part on a load cycle profile of one or more electric machines electrically coupled to the power distribution grid.


Find Patent Forward Citations

Loading…