The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 25, 2022

Filed:

Nov. 01, 2019
Applicant:

Sunpower Corporation, San Jose, CA (US);

Inventors:

Udo Uebel, San Francisco, CA (US);

Gaurang Kavaiya, Concord, CA (US);

Kevin C. Fischer, Orinda, CA (US);

Carl Lenox, San Rafael, CA (US);

Donald H. Scrutchfield, Austin, TX (US);

Assignee:

SUNPOWER CORPORATION, San Jose, CA (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G01R 21/00 (2006.01); H02J 3/38 (2006.01); H02J 13/00 (2006.01); H04L 12/28 (2006.01); G01R 22/06 (2006.01); G01R 21/06 (2006.01); G01R 22/00 (2006.01); G05F 1/66 (2006.01); G06Q 50/06 (2012.01); H02J 3/06 (2006.01); H02J 3/00 (2006.01);
U.S. Cl.
CPC ...
G01R 21/007 (2013.01); G01R 21/06 (2013.01); G01R 22/00 (2013.01); G01R 22/06 (2013.01); G01R 22/063 (2013.01); G05F 1/66 (2013.01); G06Q 50/06 (2013.01); H02J 3/06 (2013.01); H02J 3/383 (2013.01); H02J 13/0013 (2013.01); H02J 13/0079 (2013.01); H04L 12/2825 (2013.01); H02J 3/003 (2020.01); Y02B 70/30 (2013.01); Y02E 10/56 (2013.01); Y02E 40/70 (2013.01); Y04S 10/123 (2013.01); Y04S 20/20 (2013.01);
Abstract

Methods, systems, and computer readable media are disclosed for monitoring photovoltaic solar systems. In some examples, the system includes a solar power measurement input for coupling to a solar panel system, a measurement circuit configured to measure power produced by the solar panel system using the solar power measurement input, and a data transmission system. The measurement circuit is configured, by virtue of the measurement circuit including electrical components rated to at least a certain tolerance level, to take revenue-grade power measurements from the solar power measurement input with a level of accuracy that meets a national or international metering standard. The data transmission system is configured to transmit the revenue-grade power measurements from the measurement circuit to a remote system.


Find Patent Forward Citations

Loading…