The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 18, 2022

Filed:

Aug. 08, 2016
Applicant:

Hitachi Automotive Systems, Ltd., Hitachinaka, JP;

Inventors:

Shin Yamauchi, Tokyo, JP;

Kei Sakabe, Tokyo, JP;

Masahiro Yonemoto, Tokyo, JP;

Takanori Yamazoe, Tokyo, JP;

Keiichiro Ohkawa, Hitachinaka, JP;

Ryohhei Nakao, Hitachinaka, JP;

Assignee:

Vehicle Energy Japan Inc., Hitachinaka, JP;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H01M 10/44 (2006.01); G01R 31/396 (2019.01); H01M 10/48 (2006.01); H02J 7/00 (2006.01); B60L 3/12 (2006.01); B60L 58/16 (2019.01); H01M 10/42 (2006.01); B60L 58/12 (2019.01); G01R 31/382 (2019.01); G01R 31/392 (2019.01);
U.S. Cl.
CPC ...
G01R 31/396 (2019.01); B60L 3/12 (2013.01); B60L 58/12 (2019.02); B60L 58/16 (2019.02); H01M 10/425 (2013.01); H01M 10/44 (2013.01); H01M 10/48 (2013.01); H02J 7/00 (2013.01); H02J 7/008 (2013.01); H02J 7/0091 (2013.01); B60L 2240/545 (2013.01); B60L 2240/549 (2013.01); G01R 31/382 (2019.01); G01R 31/392 (2019.01); H01M 10/4257 (2013.01); H01M 2010/4271 (2013.01); H01M 2010/4278 (2013.01); H02J 7/0063 (2013.01);
Abstract

To perform charge/discharge control of a storage battery at an appropriate timing. In a battery controller, a battery information acquisition unit acquires information on the storage battery. A degradation progression rate calculation unit calculates a degradation progression rate of the storage battery based on the information acquired by the battery information acquisition unit. A limit value setting unit sets a limit value for controlling charge/discharge of the storage battery based on the degradation progression rate calculated by the degradation progression rate calculation unit. A timing determination unit determines a timing at which the limit value needs to be output based on the information acquired by the battery information acquisition unit. A limit value output unit outputs the limit value to a host controller based on the timing determined by the timing determination unit.


Find Patent Forward Citations

Loading…