The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Dec. 21, 2021
Filed:
Mar. 19, 2021
China University of Petroleum (East China), Qingdao, CN;
Zhanjiang Branch of Cnooc (China) Co., Ltd, Zhanjiang, CN;
Baojiang Sun, Qingdao, CN;
Zhiyuan Wang, Qingdao, CN;
Shujie Liu, Zhanjiang, CN;
Yonghai Gao, Zhanjiang, CN;
Baitao Fan, Zhanjiang, CN;
Hao Li, Qingdao, CN;
Shen Guan, Zhanjiang, CN;
Haikang He, Qingdao, CN;
Bangtang Yin, Qingdao, CN;
Xiaohui Sun, Qingdao, CN;
Xuerui Wang, Qingdao, CN;
China University of Petroleum (East China), Qingdao, CN;
Zhanjiang Branch of CNOOC (China) Co., Ltd, Zhanjiang, CN;
Abstract
The present invention provides a method and equipment for optimizing hydraulic parameters of deepwater managed pressure drilling in real time. The method comprises: acquiring overflow parameters in the current drilling process, performing preprocessing and feature extraction on the overflow parameters, and inputting the overflow parameters into trained support vector machine identification models for overflow judgment. If overflow occurs at the current drilling depth, reducing an opening of a throttle valve and increasing a displacement of a submarine pump, measuring a wellhead back pressure and calculating a bottom hole pressure, and judging whether overflow continues is performed. If overflow continues, mixing high-density drilling fluid with the original drilling fluid, pumping the mixture into a wellbore annulus, and performing the above operations of reducing the throttle valve opening, increasing the displacement of the submarine pump, calculating the bottom hole pressure and judging whether overflow continues is performed until overflow no longer occurs.